The Word of God Holistic Wellness Institute

"Helping The World DISCOVER THE WAY of LOVE!"

Sewer line to be built through Sun City

Cars+Sell Your CarBuy a CarResearch CarsFinanceFind a DealerPlace an AdShare PhotoThe Sun City portion of Menifee will undergo some major sewer construction in the next 13 months, with pipelines to be buried on two golf courses and trenches disrupting traffic on some of the area's busiest streets.The Sun City Force Main and Recycled Water Replacement Project started last week with preliminary work, said Roxanne Rountree, public affairs officer for the Eastern Municipal Water District. The thrust of ugg bailey button triplet boots black 1873 the work will begin in earnest June 4 and is expected to take 390 days to complete.The district is increasing its capacity to move home sewage from a lift station near Salt Creek and UGGs On Sale Murrieta Road to the Perris Valley Regional Reclamation Facility about five miles away.A 12 UGGs On Sale inch line carrying recycled water also is being replaced.The wastewater flows from homes by gravity to the lift station, where it accumulates in a wet well. Once it reaches a certain level, it's pumped from the lift station to the Perris treatment plant."The existing force main ugg bailey button triplet for women is 20 years old and has reached capacity (5.5 million gallons daily)," said Armando Arroyo, the water district's project engineer. "By adding more force main, you add more capacity without having to make a major expansion of the lift station. And you decrease the possibility of major spills."The district will be laying a new 30 inch force main parallel to the existing 20 inch line. The two lines will be connected at a point in the route, and a new 36 inch pipe will carry the waste to the treatment plant.The cost of the project is $14.9 million, to be paid from the district's general fund and revenue from future connections.The general contractor is Weka Inc. of Highland, which submitted a low bid of $10.7 million. The remaining $4.2 million will pay for design, surveying, inspection and geotechnical studies.The pipeline route will proceed down Valley Boulevard and across Murrieta Road. From there, it will follow Westridge Avenue, Bellwood Drive and cross Ridgemoor Road.It will also cross Sun City Boulevard and Cherry Hills Boulevard. From there, it will follow Northwood Drive and McCall Boulevard. The pipe will turn back north on Sun City Boulevard, and then on Barnett Road to Ethanac Road.

Views: 2

Comment

You need to be a member of The Word of God Holistic Wellness Institute to add comments!

Join The Word of God Holistic Wellness Institute

May God Bless & Prosper You!

Peace, The Comforter, The Holy Spirit & The Spirit of Truth!

LOVING TO LEARN ASSOCIATION
"Holistic Wellness and Health"
Health, Education, and  Social Service: Crisis Intervention/Life Empowerment (323) 73-LIGHT
Appointments (323) 402-0422
Loving to Learn Online Store
Loving to Learn Online Store
"Over 300 Low Priced, Quality Products"

Your Holistic Wellness: Spirit, Body and Mind

Unity... Committed to God and You!

TIME IS RUNNING OUT!

 

© 2024   Created by Drs Joshua and Sherilyn Smith.   Powered by

Badges  |  Report an Issue  |  Terms of Service